Jump to content
TomasK

ESMC/ERA 7 Change maximum concurrent running tasks

Recommended Posts

Hi, I would like to change/set maximum concurrent "Software install" task limit.

I tried find out this option via web console and server config file, but unfortunately I didn't find it out.

Is it possible?

 

Kind Regards,

 

ESET Security Management Center (Server), Version 7.2 (7.2.1266.0)
ESET Security Management Center (Web Console), Version 7.2 (7.2.221.0)

Share this post


Link to post
Share on other sites

Unfortunately there is no such possibility as execution of tasks is not synchronized across network in any way and clients do have full control of when tasks will be executed.

In case of this specific task, where parallel execution might cause problems, it is recommended to use randomized scheduling, which should be sufficient in case distribution of installations in some time interval is expected.

Share this post


Link to post
Share on other sites

Hi Martin,

thanks for your reply.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...